HVAC-R Project Dashboard User Guide
Overview:
The HVAC Dashboard is divided into three groups:
- Refrigeration Efficiency Improvement Project – for projects execution to enhance refrigeration efficiency of water-cooled chiller, air-cooled chillers, DX units and cold room refrigeration systems
- Heat Transfer Fluid Efficiency Improvement Project – for project execution to enhance the heat transfer efficiency between chillers and the cooling/heating units such as air-handling units and data center cooling
- Project Overview – individual project item overview selected from the above two project groups, and overall building project overview
Steps:
A. Project details:
- Enter your own company name
- Enter your client’s company name
- Enter building name/type (eg. Data center, hotel, shopping mall)
- Enter the building address
- Enter a given name to the current project under review
B. Refrigeration Efficiency Improvement Project
Click Step 1: HVAC-R Configuration dashboard
- Select System Type under study (DX unit, cold room refrigeration, air-cooled chiller or water cooled chiller)
- For DX unit and cold room refrigeration, select cooling capacity load with COP. Or enter brand/model/cooling capacity/COP/EER that override the dropdown selection.
- For air-cooled chiller and water-cooled chiller, select brand, model, cooling capacity, and EER from fields with drop down. Or enter brand/model/Cooling Capacity//EER that override the dropdown selection.
- The details are displayed on the right side of the screen, together with power in KW, and the power consumption per day in KWH/Hr for 24 hr and 12 hr operations.
- The estimated coil size of Dx units, cold room refrigeration system and air-cooled chillers is calculated and displayed
- The estimated dosage of MaxR100 in oz is calculated and displayed.
- See also charts of energy consumption in KWH/day for 24 hr and 12 hr operations for different cooling capacity and EER (KW/Rton) – click to select charts for views
Click Step 2 : Refrigeration Efficiency Costing dashboard, when you are satisfied with details in Step 1.
Coil coating work:
- Click the checkbox of Coil Coating if coil coating work is to be executed.
- Enter the number of units to conduct in the current refrigeration efficiency improvement project
- Enter the cost of Radiant+ per litre
- Enter the actual coil size (m2) whenever available
- For DX units and cold room refrigeration units, enter the number of units you team of 2 can complete per day.
- For cold room refrigeration units and air-cooled chiller, enter the thickness of the fin-coil
- The number of liters of Radiant+ and the cost are calculated and displayed
Active Refrigerant Agent
- Click the checkbox of Active Refrigerant Agent work if it is to be executed
- Enter the cost of MaxR100
- Enter the actual compressor oil charge (kg) whenever available
- The MaxR100 dosage in oz and cost are calculated and displayed
Refrigeration Efficiency Improvement Execution Cost
- Enter the labor cost per person per day
- Enter the number of labor deployed for the work per day
- Enter the total transportation cost per day
- Enter miscellaneous cost per day such as scaffolding rental, scissor lift rental to work at height
Costing, Profit & Margin
- The total cost of the project inclusive of all materials and execution costs is displayed
- The cost of the project per unit of the equipment is displayed
- Enter the contract price per unit, you wish to charge for the project
- The total revenue, profit margin per unit in $ and % are displayed for your reference
- Check that coil coating work and/or active refrigerant agent work checkbox(es) are checked to include in the project item.
Click Step 3 : Ref.Payback when you are satisfied with the costing
- The estimated energy consumption in KWH/day at 24hr and 12hr of operations are displayed for reference
- Enter the number of operations per day for the units
- Enter the electrical tariff in $/KWH of that is paid for the building
- The estimated energy saving @5%,10%, 15%, 20% and their respective payback of the project are summarized at the table under the Energy Savings & Payback Periods section
Click Project Costing and Payback under Individual Project and Building Project when you are satisfied with the Ref.Payback review.
- Check all HVAC configurations, revenues and contract prices in detail
- Enter the number of units to work on in this project
- Review the total project cost
- Review the table of Project summary for energy savings and payback periods in detail
When you are satisfied with the detail, click “Add to Building Project”
C. Heat Transfer Fluid Efficiency Improvement Project
Click Step 1: Heat Transfer Fluid Costing
- Click “Select for Project Payback”
- There are two schedules of chiller plant operations available.
- In one of the schedules 1 or 2
- enter the number of days of operations per week
- Enter the start time and end time of the day
- Enter the number of days of operations per year
- Enter the details of all chillers in operations at PEAK LOAD
- Cooling capacity of each chiller
- EER (KW/Rton) of each chiller
- Aquene Heat Transfer Fluid Costing
- Enter the cost of Aquene per kg
- Enter the number of kg per total Rton (arrived from the chiller peak load details) – generally 30kg/Rton
- The volume of Aquene and total cost of Aquene are calculated and displayed
- Execution cost calculation
- Enter the labor cost per person per day
- Enter the number of labor deployed per day
- Enter the expected number of days for the project execution
- Enter the transportation cost and miscellaneous cost (such as pre-Aquene installation chilled water treatment cost when required)
- Costing, Profit & Margin (Schedule 1 / Schedule 2) : The total Aquene cost and total Execution cost are displayed
- Enter the contract price desired
- The profit margin in $ and % are calculated and displayed
Click Step 2: Aquene Payback when you are satistied with the Heat Transfer Fluid Costing
- Enter the electrical tariff paid for the building
- Review the Payback details in the calculated and displayed
- Click Project Costing and Payback under Individual Project and Building Project when you are satisfied with the Aquene Payback review.
- Check all HVAC configurations, revenues and contract prices in detail
- Enter the number of units to work on in this project – general 1 as it includes all chillers under review.
- Review the total project cost
- Review the table of Project summary for energy savings and payback periods in detail
- When you are satisfied with the detail, click “Add to Building Project”
When Coil Coating, Active Refrigerant Agent and Aquene are applied in multiple in a project for the building , ensure that those to be worked on are selected in their respective costing dashboard, and de-select those not worked on.
D. Building Project
- Enter the carbon emission factor of the country where the building is situated, in Kg CO2e/KWH
- Repeat all the above for other HVAC equipment in the building
- Review the Building Project items
- Click Building project Quotation to review the quotation items for the building. Change the number of units and contract prices when you wish. You can print the quotation in MS Doc, MS Excel and MS Powerpoint slides at a click of the button at the bottom.
- Click Bill of Material to review the amount of Radiant+, MaxR100 and or Aquene Heat Transfer Fluid for the Building Project for material preparation.
At any time, when you are satisfied with the configuration, costing, payback, project costing and payback overview, quotation and bill of materials, you can print in MS Doc, MS Excel or MS Powerpoint for your records.
Or you can click on the header section Export full report – All Dashboards (Powerpoint) at one goal. It is encouraged to print after each review at each dashboard level for greater details.
When you have completed and printed the Costing, Payback, Quotation and Bill of Material work, you can click to reset all before working next project for tbe same building or other buildings.
Please reach out to Radiant Climate Technologies if you have any questions.