Case study · Radiant+ E3 · Office, Malaysia

Radiant+ E3 trial on a Daikin split air conditioner in Malaysia: 22.5% less energy per day

A Daikin split air conditioner cooling a container cabin office in Petaling Jaya, Malaysia, used 22.5% less electricity per day after its condenser coil was restored and coated with the Radiant+ process. Every operating hour from 9 am to 9 pm used less energy than before.

Technician washing a Daikin condenser coil before coating

What changed after coating?

Average daily consumption fell from 9.14 kWh before coating to 7.09 kWh after — a 22.5% reduction. Hourly consumption between 9 am and 9 pm was lower in every hour, by between 18.75% and 38.3%.

9.14 kWhAverage per day, before
7.09 kWhAverage per day, after
−22.5%Daily energy
−18.75% to −38.3%Each operating hour, 9 am–9 pm
StageAverage daily energyChange
Before coating9.14 kWh—
After coating7.09 kWh−22.5%

Average daily ambient temperature was about 0.85 °C lower in the post-coating week, which accounts for a small part of the reduction. A saving of about 2 kWh a day is roughly 750 kWh a year for this single small unit.

Bar chart of daily kWh before (blue) and after (red) coating with ambient temperature
Daily kWh before coating (blue) and after coating (red), with average lines and ambient temperature.
Average hourly load profile before and after coating
Average hourly load profile: after coating (blue) sits below before coating (red) through the operating day.

What was the site and the equipment?

The trial unit cools a single-storey office built from a shipping-container cabin in Petaling Jaya, Selangor. With few occupants and no internal heat sources, the main load is solar heat on the cabin.

Site type and location
Container cabin office, Petaling Jaya, Malaysia
Equipment
Daikin Eco King single-phase, single-fan DX split air conditioner
Solution
Radiant+ E3 Coating System: clean, de-rust, Radiant+ Prime passivation, Radiant+ coat
Baseline
24 September – 12 October 2026
Coating day
21 October 2026
Post-coating
15 days of metered data from 22 October 2026
Measurement
4G smart energy meter with current transformer; voltage, current and power logged every 5 minutes to the cloud, alongside ambient temperature

How was the Radiant+ process applied?

The unit was shut down, the casing removed and the condenser coil taken through restoration, surface preparation and coating before reassembly — all in one visit.

  1. Preparation. Power shut-down, casing removed, water wash with an alkaline caustic cleaner.
  2. Restoration. De-rusting agent applied and left to act for about 20 minutes, then washed off.
  3. Surface preparation. Radiant+ Prime passivation, 20–25 minutes, washed and left to dry 25–30 minutes.
  4. Protection and efficiency. Radiant+ coating sprayed onto the coil, casing reassembled, data collection resumed.

How Radiant+ E3 works All project case studies

Frequently asked questions

Was the weather the same before and after?

Not exactly: the post-coating period averaged about 0.85 °C cooler. The hourly profile shows lower consumption in every operating hour, including the hottest ones, which a small temperature difference alone would not explain.

How long does the coating process take?

For a single split unit the full process — wash, de-rust, prime, coat and reassemble — is completed in one visit of a few hours.