Which measures need a shutdown and which do not?
Most heat-transfer and control measures need no shutdown or only a short, planned one per unit.
| Measure | Disruption | Notes |
|---|---|---|
| AI chiller and HVAC optimisation | None — system keeps running | Wireless sensors; works alongside the existing BMS, with a switch back to the original control mode |
| MaxR100 | None — added while the system runs | Introduced into the refrigerant/oil circuit during normal operation; no flushing or disassembly |
| Aquene | Minimal — can be done during live operation | For closed chilled-water loops; no equipment replacement |
| Energy metering and data logging | None | Clamp-on or panel meters; needed for any verified saving |
| Radiant+ E3 coil restoration and coating | Short shutdown of each unit treated | Safety shutdown while coils are washed and coated; about 4–6 coils of up to 3 m² can be coated on both sides in an 8-hour day |
| Window film | Low — room by room | Usually installed after office hours |
| Chiller tube cleaning, VSD installation | Planned outage of one chiller at a time | Use standby capacity |
| Chiller replacement | Highest — weeks of works, crane lifts, BCA submissions | Usually needs temporary cooling or a planned shutdown window |
How should the work be scheduled?
Treat one unit at a time while the others carry the load, and schedule shutdown work outside tenants' operating hours.
- Use standby (N+1) capacity: take one chiller, AHU or condensing unit off line while the rest run
- Plan coil work for nights, weekends or public holidays in offices; quiet periods in retail and hotels; maintenance windows in hospitals and data centres
- Start the baseline measurement two to four weeks before the work, so the shutdown does not delay the savings evidence
- Tell tenants in advance which areas are affected and for how long
- Combine shutdown work with scheduled maintenance to avoid a second outage
Frequently asked questions
Will tenants notice any change in comfort?
They should not. Energy-saving measures are set up to hold the agreed temperature and humidity; in RCT's Xi'an Metro case, audited indoor temperatures were steadier after AI control.
Can coil coating be done on a running system?
No. Each unit is shut down for safety while its coils are washed, prepared and coated, then returned to service the same day in most cases.