Which measures suit which type of system?
The right measures depend on whether the building has a water-cooled chiller plant, air-cooled chillers, or DX/VRF units.
| System | Measures that do not need replacement | RCT technology |
|---|---|---|
| Water-cooled chiller plant | AI or rules-based plant optimisation; oil-fouling removal in the refrigerant circuit; graphene heat-transfer fluid in the closed chilled-water loop; tube cleaning; chilled-water reset and pump speed control | AI chiller system, MaxR100, Aquene |
| Air-cooled chillers | Condenser coil restoration and coating, plus the measures above | Radiant+ E3, MaxR100, Aquene |
| AHUs and FCUs | Cooling-coil cleaning and coating, fan speed control, schedule and ventilation tuning | Radiant+ E3, AI optimisation |
| DX split and VRF units | Condenser and evaporator coil restoration and coating; oil-fouling removal | Radiant+ E3, MaxR100 |
| Building envelope | Window film and reflective roof or wall coatings to cut solar heat gain | UV window film, passive cooling coatings |
How much can each measure save?
Ranges below are measured savings on the treated equipment from RCT's projects and partners' published results; your result depends on the system's condition and operating hours.
| Measure | Typical measured savings | Evidence |
|---|---|---|
| Radiant+ E3 coil restoration and coating | 10–25% | Dubai rooftop units, 18.5%; Malaysia split unit, 22.5% |
| MaxR100 refrigerant performance enhancer | 16–35% typical | 1,100-ton chiller, kW/RT −14.1%; nine projects |
| Aquene heat-transfer fluid | 15–30% at system level | 13 chilled-water projects |
| AI chiller and HVAC optimisation | 30–50% in published cases | Xi’an Metro, 40–50% audited |
Savings from several measures on the same system do not simply add up, because each one reduces the energy the next one acts on. A combined 15% on a 1,000 RT water-cooled plant is worth about S$197,000 a year at Singapore tariffs — see the Singapore savings and payback study.
In what order should I do them?
Measure the baseline, fix controls and operation, restore heat transfer, then verify — and only then consider replacing equipment that still underperforms.
- Measure plant kW/RT, ΔT and run hours for at least a week
- Correct schedules, set-points and staging (fast, low cost)
- Restore heat transfer: coils, refrigerant circuit, chilled-water fluid
- Reduce load: solar gain, ventilation, airflow
- Verify savings against the baseline, then decide on any replacement
RCT's energy efficiency consulting and project planning services follow this sequence.
Frequently asked questions
Do these measures void equipment warranties?
Check with the equipment manufacturer and your maintenance contractor before any work on equipment still under warranty, and ask the supplier for written compatibility information.
Can the work count towards BCA's Mandatory Energy Improvement target?
The regime is outcome-based, so any measure that reduces the building's measured energy use intensity counts; the qualified professional appointed for the audit decides what goes into the improvement plan.